Thevenard feed bin and conveyer package
Thevenard, SA
Working with Ahrens to deliver the final fit-out of the processing plant, Reimann was responsible for the fabrication and installation of various steel hoppers, all steam and boiler line work and the stainless-steel ducting.
Clients: Ahrens Group
- All steam lines site run fabricated on site
- Large dimeter Stainless steel fabricated ducts rolled from flat sheet to make large diameter bends and fittings
- Shop drawings of fittings