Regency Road to Pym Street Upgrade – Pipeline

Adelaide, SA

The Regency Road to Pym Street project includes the design and construction of a new 1.8-kilometre section of the non-stop motorway along South Road, part of Adelaide’s North-South Corridor initiative.

As part of this wider North-South Corridor project, Reimann was responsible for delivering the 559 OD MSCL line that ran down Regency Road in preparation for the for this section of the northern connector. Key deliverables included:

  • Night works to minimise disruption to traffic
  • Delivery of all the fittings and site welding
  • Shut down tie-ins

Preparation of full workshop drawings of the total line.

Clients: Fulton Hogan